Jacksonville Electric Authority

Jacksonville Electric Authority

Jacksonville Electric AuthorityYates Construction provided construction services for Jacksonville Electric Authority’s limestone storage facility.  The project included installation of a 300 x 90 x 90 foot limestone stockpile cover and limestone distribution conveyor connected to a ship unloading facility, area lighting, and instrumentation.

  • Owner

    Jacksonville Electric Authority

  • Size

    2.4 Million Cu. Ft.

  • Markets

    Power,

Owner

Jacksonville Electric Authority

Size

2.4 Million Cu. Ft.

Role

General Construction

Markets

Power,