Jacksonville Electric Authority
Yates Construction provided construction services for Jacksonville Electric Authority’s limestone storage facility. The project included installation of a 300 x 90 x 90 foot limestone stockpile cover and limestone distribution conveyor connected to a ship unloading facility, area lighting, and instrumentation.
-
Owner
Jacksonville Electric Authority
-
Size
2.4 Million Cu. Ft.
-
Markets